CON 1162 Smart Electricity Meters, Smart AMI HES
Value
Estimated€162,000,000 · 162,000,000 EUR
Awarded—
CPV codes
38554000 Laboratory, optical & precision equipmentDescription
The Contracting Entity intends to procure a multi-vendor framework agreement for the provision of Lot 1: Smart Electricity Meters and Lot 2: Smart Advanced Metering Infrastructure (AMI) Head-End System (HES). ESB anticipates procuring: • Manufacture, supply, and delivery of up to 1,500,000 Single-Phase and Three-Phase Whole current Smart Electricity Meters, to be called off incrementally over the life of the framework as required. • Development (inclusive of Security Architecture), development, implementation, and integration of the required IT systems, including but not limited to the following: • A Head End System (HES) capable of integrating with multiple SEM meter vendor’s products concurrently, delivering high levels of interoperability across multiple devices, communications and system vendors within a complex AMI environment. • A Head-End System (HES) capable of meeting ESB Networks’ functional, security, and performance requirement for 1.5 million SEMs initially and the capacity to scale up to potentially 3 million SEMs during the contract term. • The integration and development of an adaptor between the HES and the Siemens Energy IP Meter Data Management System (MDMS). • All associated integrations with existing ESB Networks systems and operational platforms. • Integration with Mobile Network Operator systems • Implementation of the AC Electricity Smart Meter Generic Companion Profile (ACE SM GCP) and local customisations to support the reliable and secure communication between the HES and SEMs across Wide Area Network (WAN) technologies. • System implementation services, including configuration, testing, migration, and commissioning of the proposed IT systems. • Ongoing support, maintenance, and management services to ensure continuity of operations, system performance, and long-term lifecycle management. Economic Operators who wish to participate in this Prequalification Questionnaire process should submit a response as set out in section A.3 of the attached document. At the date of issuing this PQQ it is envisaged that the duration of the Framework Agreement will be a six (6) year term with the option to extend to an additional nine (9) years to cover ongoing IT and technology support and maintenance services for both Lots.
Similar tenders
Closest by meaning — across languages, via embeddings.
| Published | Title | Buyer | Match |
|---|---|---|---|
| 2026-09-22 | CON 1212 QUALIFICATION SYSTEM FOR SUBCONTRACTED COMMERCIAL VEHICLE AND EQUIPMENT MAINTENANCE INCLUDING 40' SEMI TRAILERS FOR ESB NETWORKS FLEET | Electricity Supply Board ( ESB ) IE | 88% |
| 2026-06-08 | CON1199 - Qualification System for Electrical Distribution Substation Works | Electricity Supply Board ( ESB ) IE | 88% |
| 2026-06-10 | The provision of ESB Communication Tower Compound Maintenance Weed Control services | Electricity Supply Board ( ESB ) IE | 88% |
| 2026-08-26 | 2026 52 Single Party Framework Agreement for the Supply of Carbon Measurement and Management Interactive Learning Experience Solution | Louth and Meath Education and Training Board 1384 IE | 88% |
| 2026-05-05 | Provision of Service and Availability Agreement(s) (SAA) for Individual and/or Multiple Wind Farm Sites and/or the Provision of Major Component Replacement Services for specified Wind Farms only | — IE | 88% |
| 2026-10-27 | Implementation of Battery Energy Storage System at Čierny Váh | Slovenské elektrárne, a.s. SK | 87% |